
Completed
Alder Castle
Sub-contract appointmentCity of London2024
Project overview
Facade engineering validation and calculation support for a commercial refurbishment at Alder Castle, coordinating the facade package with performance and buildability requirements.
Support focused on engineering validation, calculations and coordinated facade-system review, with fire barriers and insulation strategy checked against the wider envelope build-up.
Relevant disciplines
Key facts
SectorCommercial
RegionCity of London
EnvelopeFacade refurbishment
Fire / insulationSiderise + Rockwool
SupportValidation + calculations
Have an envelope challenge?
Bring us in early. The sooner we engage, the more risk and cost we can design out of your building envelope.

